Denver Industrial Sales and Service Company

KM T-2 Asphalt Recycling Machine

OUR EQUIPMENT:

The KM T-2 is an asphalt recycling machine capable of producing 4 tons of hotmix asphalt in an hour. The KM T-2 asphalt recycler trailer will recycle asphalt millings, chunks, and other RAP material into plant-grade asphalt. The KM T-2 allows contractors the ability to perform year-round repairs with quality hotmix asphalt material.

FEATURES:

  • Cost Savings: Asphalt for $15-25 a ton compared to $60-75 at the plant or $110 + for cold patch
  • Efficiency: Produces a load of 2,600Lbs. every 15-20 minutes or Approx. 4 tons/hr.
  • Reliability: Recycle millings into plant quality or better mix year round. NO DIRECT FLAME IMPINGEMENT ON MATERIAL
  • Green Process: No longer do you have to throw out old chunks or millings
  • Versatility: Ability to add as much or as little asphalt cement as you want to completely customize you mix design
  • Profitability: If you are an asphalt producer you now have the ability to keep key customers supplied with HMA year round
  • Time Saving: Skip the long lines and hassle at the asphalt plant by using the T-2 to produce HMA at your shop or on the job site

TRAILER SPECS:

  • Dimensions (l x W x H) – 23’1” x 8.3’ x 9′
  • Weight – 8,600 Lbs.
  • Top Opening (L x W)- 26” x 94”
  • Axels – Dual 7,000 lbs. axels, w/ electric brakes on all wheels
  • Construction – 8” Channel steel with 2 ½” x ¼” square tubing support members
  • Actuators – (2) 2” x 16” hydraulic cylinders

ASPHALT HEATING DRUM:

  • Construction – 3/16” steel: 450 Brinell hardened
  • Agitation Paddles – (7) 3/16”: 450 Brinell Hardened
  • Rotation – Hydraulically controlled, approx. 9 RPM

HYDRAULICS:

  • Reservoir – 30 Gallon
  • Pump – 9.5 gal./minute
  • Motor – 38 cubic inch

HEATING SYSTEM:

  • Fuel – No. 1 or 2 Diesel, B-5 bio-diesel, or kerosene
  • Fuel Storage -80-gallon fuel tank with filter and manual shut off
  • Burner type – Beckett Model SDC
  • BTU Output – 700,000
  • Engine – 21 BHP Kubota

LOADING/UNLOADING:

  • Loading – Milled asphalt or broken chunk pieces up to 12”
  • Unloading – Unload directly into application area or into front end loader bucket